Arranging your home…
A design you can explore
The four floor layouts follow the architect's 12 September 2026 drawing set (working drawings, door/window and electrical layouts). Doors, sliders and windows are placed from the door/window schedules; joinery follows the drawn recesses.
- The open kitchen and island follow the electrical drawing, which differs from the working drawing’s kitchen/store partition.
- The ground-floor parking, road, gardens, bathroom fit-out, lift, corrected red column and relocated bedroom almirah reflect the owner’s review.
- The second- and third-floor balconies retain an opening in front of the common stair for conversation between floors. The third-floor rear balcony has glass protection without the earlier masonry band.
- Front elevation (owner's review): the front balconies have cement railings with a black steel handrail instead of glass, the two double-height pockets are open, guarded by the balcony railing turning along each open end (owner, 12-11-2026: the closing walls and the second-floor ledge in the left pocket were removed), the stair bay gets an outside screen (black steel fins or cement jaali, switchable) and the roof overhang is continued over the stair. Teak soffits, stone-clad columns, chandeliers in the double-height pockets, pendants and cove lights are proposed finishes.
- The rooftop cinema is a design proposal facing the mumty wall below the tanks.
- Furniture, rugs, art, plants, materials, facade treatments and decorative lights are proposed design choices. Electrical symbols are not reproduced as a certified installation layout.
- Floor-to-floor height is assumed at 3.048 m (10 ft), slab thickness at 127 mm and parapets at 1.067 m. Sections and elevations are needed to confirm vertical dimensions.
- Opening positions include approximate placements from tags. Room extents and joinery are schematic; this is not a fabrication or construction model.
Explore: drag to orbit, scroll to zoom, and right-drag to pan. Choose a room and step inside; drag to look and use W/A/S/D, arrow keys or the on-screen arrows to move. Escape returns to dollhouse. Stairs, the lift lobby and the duplex slide connect the floors while walking; doors open as you approach (E or Use toggles them) and the living-room bay slides open onto the front balcony. The chores checklist in the sidebar tracks what you have discovered.
About this viewer: the model runs in your browser. No account is required.